Show Navigation
back to search results

BTSExtensionOpens

06 DECEMBER 2018 - SAMUT PRAKAN, THAILAND: People wait for the BTS Skytrain in Kheha station. The 12.6 kilometer (7.8 miles) east extension of the Sukhumvit Line of the Bangkok BTS Skytrain opened today. The system is now 51 kilometers long (32 miles), including the 12.6 kilometer extension that opened 06 December. About 900,000 people per day use the BTS. PHOTO BY JACK KURTZ

Add to Cart Add to Lightbox Download
Filename
BTSExtensionOpens017.jpg
Copyright
© 2018 Jack Kurtz
Image Size
5184x3888 / 15.3MB
120618 BTS Commuter Infrastructure Light Rail Skytrain
Contained in galleries
Thailand (All)
06 DECEMBER 2018 - SAMUT PRAKAN, THAILAND:  People wait for the BTS Skytrain in Kheha station. The 12.6 kilometer (7.8 miles) east extension of the Sukhumvit Line of the Bangkok BTS Skytrain opened today. The system is now 51 kilometers long (32 miles), including the 12.6 kilometer extension that opened 06 December. About 900,000 people per day use the BTS.       PHOTO BY JACK KURTZ
Prev Next
Info
  • Facebook
  • Twitter
x

Jack Kurtz: Photojournalist & Travel Photographer

  • Photographs
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Jack on Instagram
  • About
  • Published Work
  • Contact
  • My Occasional Blog
  • Portfolios on Behance
  • Portfolio