Show Navigation

LightRailOpening

27 DECEMBER 2008 -- PHOENIX, AZ: At 9:45AM Former Phoenix mayor John Driggs (CQ RIGHT) and his wife, Gail, were among the folks at the opening of the downtown Phoenix (Washington and 3rd Street) station. Metro Light Rail started running Saturday, Dec. 28. ARIZONA REPUBLIC PHOTO BY JACK KURTZ Metro Light Rail started running Saturday, Dec. 28. The light rail line is 20 miles long and cost $1.4 billion dollars. PHOTO BY JACK KURTZ

Add to Lightbox Download
Filename
LightRailOpening012.jpg
Copyright
Jack Kurtz
Image Size
4000x2667 / 5.9MB
AZR Arizona Economy Light Rail Mass Transit Phoenix Transport
Contained in galleries
Phoenix (all)
27 DECEMBER 2008 -- PHOENIX, AZ: At 9:45AM Former Phoenix mayor John Driggs (CQ RIGHT) and his wife, Gail, were among the folks at the opening of the downtown Phoenix (Washington and 3rd Street) station.  Metro Light Rail started running Saturday, Dec. 28.  ARIZONA REPUBLIC PHOTO BY JACK KURTZ Metro Light Rail started running Saturday, Dec. 28. The light rail line is 20 miles long and cost $1.4 billion dollars. PHOTO BY JACK KURTZ
Info
  • Facebook
  • Twitter
x

Jack Kurtz: Photojournalist & Travel Photographer

  • Photographs
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Jack on Instagram
  • About
  • Published Work
  • Contact
  • My Occasional Blog
  • Portfolios on Behance
  • Portfolio